← Back to homepage

Charles Dickens’ writing chalet among sites added to heritage at risk register
Sources
2
Coverage
Limited spectrum
Sentiment
0.00
◀ Left 100%Centre 0%Right 0% ▶
How we rate bias →This story is currently only covered by 2 sources from a limited part of the political spectrum. NewsDeck will update this page automatically if other outlets pick up the story.
NewsDeck Poll
Do you think this story is being covered fairly across the political spectrum?
Loading…
Left
(2)
The Guardian
Norman conquest castle and Dickens chalet among sites added to heritage at risk register
William the Conquerer-built Hastings Castle and Swiss-style writing retreat in Kent two of nearly 200 additions to list
A castle built by William the Conquerer, a Swiss-style chalet where Charles Dickens wrote and a swathe of fire-blasted moorland are among sites that have been added to Historic England’s heritage at risk register.
Almost 200 historic places have been added to the already extensive list, including Ha…
5 Nov, 06:00
Evening Standard
Charles Dickens’ writing chalet among sites added to heritage at risk register
But other historic buildings such as the hut where Edward Jenner performed the first vaccinations against smallpox have been saved.
5 Nov, 00:01
Centre
(0)
No coverage from this perspective yet
Right
(0)
No coverage from this perspective yet