← Back to homepage
Iconic London bridge could be forced to shut down within three years after cracks found
Sources
1
Coverage
Limited spectrum
Sentiment
0.00
◀ Left 0%Centre 0%Right 100% ▶
How we rate bias →This story is currently only covered by one source from a single part of the political spectrum. NewsDeck will update this page automatically if other outlets pick up the story.
NewsDeck Poll
Do you think this story is being covered fairly across the political spectrum?
Loading…
Left
(0)
No coverage from this perspective yet
Centre
(0)
No coverage from this perspective yet
Right
(1)
GB News
Iconic London bridge could be forced to shut down within three years after cracks found
Waterloo Bridge could be shut within as few as three years if essential repair work is not completed.
An inspection of the crossing, which connects the South Bank to the West End, uncovered water damage and cracks up to two millimetres wide.
The findings were detailed in a Westminster City Council funding-bid document obtained by Bloomberg through a Freedom of Information request.
Without repairs by the end of the …
29 Sept, 03:38